Date Amount Purpose Company
       
09/26/98 1850.00 Initial Castings Purchase Tom Gazsi
09/26/98 200.00 Shipping Charges Tom Gazsi
09/26/98 49.50 Drawing Updates Tom Gazsi
10/06/98 20.00 Polish Bell Speedway Metal Finishing
10/30/98 399.21 Engine Side Frames Riddle Machine
12/16/98 200.00 Injectors (2 @ 100.00) SuperScale Locomotive
12/21/98 43.04 Cast iron for piston rings McMaster Carr
12/29/98 140.73 Material Driver Tires Kelly Pipe
01/06/99 47.41 Tooling to turn driver tires Industrial Metal Supply
01/08/99 131.00 1 Pair Coupler Castings Skagen Locomotive
02/08/99 163.36 Engine & Tender Journal Bearings MidPoint Bearing
02/10/99 78.50 SideRod Needle Bearings MidPoint Bearing
02/11/99 90.00 Leaf Spring material McMaster Carr
04/19/99 984.25 Air and Water pump castings Skagen Locomotive
06/17/99 204.29 Boiler & Smoke box material State Pipe & Supply
06/21/99 61.74 Firebox, flue sheet material Industrial Metal Supply
06/21/99 157.11 Type K Copper Flues Familian Plumbing
06/29/99 35.00 Heat Treating Crank Pins Milspec Heat Treating
       
       
  4855.14 Total